Here’s Ethan’s Life, where I share articles, photos and ideas. By @e1hanw0ng.
🎞️ 将今年上半年拍摄的四卷胶片照片更新到了我的相册上。

https://gallery.ethanwong.me

这几卷胶片的拍摄其实都不算太顺利,新相机的首次磨合适应、因为操作失误导致底片有折痕,以及意外摔掉了相机导致片仓被打开……

今年因为一些种种的烦心事,无论是通过照片还是文字记录和分享生活的欲望变得很低。

这些胶片照片记录了这半年来很难忘的一些经历,包括与朋友相聚、告别、探索新的旧的咖啡店、三月份的 Can Festival、四月份在东京和香港的旅行,以及五月份的越位音乐节。

#life@gettoset_channel
Ethan’s Life
🔗 Objective-C Direct Methods https://nshipster.com/direct/
查问题逆向之后打算 swizzle 一个 Objc 方法,发现它不能被 performSelector 调用,仔细看汇编发现竟然是静态派发的。研究了一圈才知道有 direct method 这种特性。🤯

#TIL@gettoset_channel
Ethan’s Life
🔗 The First Time I Was Almost Fired From Apple https://www.engineersneedart.com/blog/almostfired/almostfired.html
有时候还挺费解为什么 Mac 的 Color Picker 会有“蜡笔”面板,原来是工程师自娱自乐的产物。

> On a roll, I decided to also knock out a “crayon picker”. At this point, to be clear, the color picker was working and I felt I understood it well enough. As I say, I was kind of just having some fun now.

> And I wrote the crayon picker because it seemed to me to be the kind of thing Apple was all about: HSL, RGB — these were kind of nerdy color spaces — a box of crayons is how the rest of us picked colors.
Ethan’s Life
Apple 自己也犯了忘记设置 clipToBounds = false 的问题🤣。
NSView 被改成默认不 clip 以后,有些控件的默认行为是有些困惑的,比如 textField 的 … 后面有时候还能展示出文字。
Apple 自己也犯了忘记设置 clipToBounds = false 的问题🤣。
调试问题的时候偶然发现,macOS Tahoe 上一些常见的 AppKit 控件比如 NSButton 竟然是 SwiftUI 绘制的🤯。
🔗 2nd Japanniversary
https://lmnt.me/blog/second-japanniversary.html

> Connecting with Japanese people is still a bit tough. Most people need a very long time to warm up. On the plus side, I've met other foreigners who connect almost instantly. We’re sharing things about each other in the first hour that I still can’t seem to with my Japanese friends after two years.
Xcode 26 从 beta 1 升级到 beta 2 以后,在设置里看不到 beta 1 的模拟器也无法卸载它。似乎模拟器安装的位置受 SIP 保护,如果升级之前忘记卸载旧的模拟器想要 reclaim 这 10GB 的空间,还得先把 beta 1 的 Xcode 安装回来才行😞。
🔗 WWDC 2025: Through Liquid Glass—No Longer Behind, Just Off to the Side
https://parkerortolani.blog/2025/06/13/wwdc-through-liquid-glassno-longer.html

> I suspect that part of the ethos behind liquid glass was to envision something that couldn’t be easily ripped off by the many Chinese companies that ship countless iPhone clones running Android skins that look terrifyingly close to the real thing.
看到矩形的 focusRing 就下意识地感慨,这界面也是 SwiftUI 的了。

对比 AppKit 按钮的 focusRing 的动画质感和自动的形状处理,其实也并不是很难实现的效果,但我们可能真的回不到追求极致细节的那个时代了。

#thoughts@gettoset_channel
Back to the days how we used our Mac years ago.
Back to Top